Download Print this page

Heartland VALUE Series Assembly Manual page 23

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
Handle panels with care to avoid breakage.
BEGIN
Install first 48" x 96" panel 5-7/8" above top plate.
1
Secure panel with 2" nails spaced 6" apart along edges and 12" apart on inside of panels.
There will be a 5-7/8" reveal at the top.
BEGIN HERE
Flush
12" (30,5 cm)
Flush
FRONT WALL PANELS
3/8" x 48" x 96"
x1
(1 x 121,9 x 243,8 cm)
Install all panels with the primed side facing up.
5-7/8"
(14,9 cm)
Flush
6"
(15,2 cm)
Flush
FRONT PANELS ARE FRAGILE!
UNTIL INSTALLED, HANDLE
CAREFULLY TO AVOID BREAKING
AT CORNERS AND EDGES.
21
x58
2" (5,1 cm)

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Soho modern