Download Print this page

Heartland VALUE Series Assembly Manual page 33

Hide thumbs Also See for VALUE Series:

Advertisement

PARTS REQUIRED:
x1
OO
TEMPORARY SUPPORT
69" (75,3 cm) Door Stiffener
x1
x1
3/8" x 42" x 96"
(1 x 106,7 x 243,8 cm)
BEGIN
Center and fasten OO as a temporary support. Measure down from floor 1" and mark.
1
Secure to floor joist with (2) 3" screws.
2
Place 42" x 96" front panel on temporary brace OO and flush with front wall stud (Fig. B).
Secure panel with (2) 2" nails in the bottom corners (Fig. A). Angle nails to hit floor frame (Fig. C).
3
Push the front and/or back wall until front and side wall panels are flush along the corner (Fig. B, Fig. D).
Secure upper corner with (1) 1-1/2" nail into rafter.
Fig. B
Flush
Flush
SIDE WALL PANELS
x1
3/8" x 42" x 96"
3/8" x 48" x 84"
(1 x 106,7 x 243,8 cm)
(1 x 121,9 x 213,4 cm)
Install all panels with the primed side facing out.
1" (2,5 cm)
OO
Fig. A
2" Nails
42"
1"
(106,7 cm)
(2,5 cm)
x2
x1
3/8" x 48" x 84"
(1 x 121,9 x 213,4 cm)
3" Screws
LEVEL
Fig. D
2" (5,1 cm
Nail
Fig. C
OO
31
3" (7,6 cm)
x2
2" (5,1 cm)
x1
1" (2,5 cm)
Floor Joist
1-1/2" Nail
PUSH
Flush at
corner
1-1/2" (3,8 cm)
1"
(2,5 cm)

Advertisement

loading

Related Products for Heartland VALUE Series

This manual is also suitable for:

Soho modern