3.11 Intel® Virtual Raid On Cpu (Intel® Vroc) Upgrade Key Installation; 3.12 Trusted Platform Module (Tpm) Installation; Figure 109. Installing The Intel® Vroc Upgrade Key; Figure 110. Installing The Trusted Platform Module (Tpm) - Intel D50TNP Integration And Service Manual

Table of Contents

Advertisement

3.11 Intel® Virtual RAID on CPU (Intel® VROC) Upgrade Key Installation
This section provides instructions to install an Intel® VROC Key in the system. Refer to the Intel® Server
D50TNP Family Configuration Guide for available
Required Tools and Supplies:
Anti-static wrist strap and conductive foam pad (recommended)
1. Remove the module to be serviced from the server chassis and place it on an anti-static work surface (see
Section
3.2.1).
2. Remove the riser assembly from Riser Slot 2 (see
3. Remove the Intel® VROC Upgrade Key from its packaging.
4. Locate the white 4-pin key connector near the right edge of the server board.
5. Place the key over the connector and confirm that the orientation of the key matches that of the
connector.
6. Press the key down onto the connector until it locks into place.

3.12 Trusted Platform Module (TPM) Installation

This section provides instructions to install a Trusted Platform Module (TPM) in the system. Refer to the
Intel® Server D50TNP Family Configuration Guide for available options.
Required Tools and Supplies
Anti-static wrist strap and conductive workbench pad (recommended)
Phillips* head screwdriver #1
88
Intel® Server D50TNP Family Integration and Service Guide
Figure 109. Installing the Intel® VROC Upgrade Key

Figure 110. Installing the Trusted Platform Module (TPM)

options.
Section
3.5.1).

Advertisement

Table of Contents
loading

Table of Contents