Komatsu PC88MR-10 Shop Manual page 1112

Hydraulic excavator
Hide thumbs Also See for PC88MR-10:
Table of Contents

Advertisement

50 Disassembly and assembly
Power train system
No.1 installation jig [14]
Installation of floating seal (31) to hub (1)
No.2 installation jig [15]
Installation of floating seal (31) to hub (1) and
spindle (2)
No.3 installation jig [16]
Installation of floating seal (31) to spindle (2)
Tightening torque
Part
Part name
number
Plug with flange
33
Plug
39
40
Bolt
50-84
Jig [17]
a No.1 thrust washer (12) can be fixed without
Jig [18]
a No.2 thrust washer (10) can be fixed without
Width
across flats
Nominal of parts
(mm)
PF3/8
8
PF3/8
8
M8 (P1.25)
13
Positioning of carrier (3) when fixing No.1
thrust washer (12)
this jig.
Positioning of spindle (2) when fixing No.2
thrust washer (10)
this jig.
Q'ty
Torque (Nm {kgm})
58.8 ± 9.81 {6.0 ± 1.0}
1
58.8 ± 9.81 {6.0 ± 1.0}
2
33.3 ± 4.9 {3.4 ± 0.5}
3
PC88MR-10

Advertisement

Table of Contents
loading

Table of Contents