MUX20JP021602
3 Close one of the two right stabilisers completely and maintain the movement
activated. Read the pressure value. This value relates to the right track distri‐
butor. Switch the machine off.
4 Connect the pressure gauge to fitting lower pressure intake.
5 Go to the control position and switch the machine on.
6 Close one of the two left stabilisers completely and maintain the movement
activated. Read the pressure value. This value relates to the left track distribu‐
tor.
7 Stabilise the machine.
8 Set the second boom cylinder to the FOLDING mode. Keep the joystick in po‐
sition. Read the pressure value. This value relates to the aerial part distributor.
Boom Lift Models X20JPLUS
MAINTENANCE
167