JLG X20JPLUS Operator, Safety, Maintenance And Service Manual page 101

Table of Contents

Advertisement

MUX20JP021602
Always keep a distance from embankments or ditches that is equivalent to the
depth of such and observe the required safety distance from power lines.
Avoid any contact with objects or persons when lowering the stabilisers.
STABILISATION PROCEDURE
Before moving the stabilisers make sure that:
• All instructions provided in this chapter have been complied with
• The ground where the machine is stabilised is compact and can support the
weight of the machine and the maximum possible reaction force on one stabiliser;
When working the load on one individual stabiliser can increase greatly due to the
shifting of weight, especially if extension and/or rotation operations are performed.
THIS  MUST  ALSO  BE  CONSIDERED  WHEN  EXAMINING  THE
GROUND.
• there are no obstacles on the stabilisation area and in the trajectory of each in‐
dividual stabiliser;
• the machine is completely closed and aligned, in the stabilisation position.
Fig. 91 Arrows feedback alignment
• Stabilisation can be carried out from the control position in the basket or on
the ground. If performing the operation from the ground, make sure there is com‐
plete visibility of the trajectory of each individual stabiliser before moving it and
check  that  at  the  end  of  the  stabilisation  procedure  the  distance  between  the
The complete closure and alignment is
displayed by the arrows on the machi‐
ne and the display of the icon in posi‐
tion  6  on  the  remote  control  ʺFig.
42 Aerial 
aligned(p. 57)ʺ.
Boom Lift Models X20JPLUS
USING THE MACHINE
part 
closed 
and
99

Advertisement

Table of Contents
loading

Table of Contents