Drilling Conduit Holes - SolarEdge SEK-I Series Installation Manual

Three phase inverter
Table of Contents

Advertisement

35
  Drilling Conduit Holes

Drilling Conduit Holes

This section describes how to drill AC and DC openings at the bottom of the Synergy
Manager for connecting the AC and DC conduits.
This procedure must be performed before mounting the Synergy Manager.
To open conduit drill guides:
1. Ensure that the Safety Switch is set to OFF (0) and ON/OFF/P switch of the Synergy
Manager is in OFF position.
2. Remove the screws securing the DC and AC panels and remove the panels from the
bottom of the Synergy Manager enclosure.
CAUTION!
To avoid damage to the internal part of the Synergy Manager, always
remove plates from unit before drilling holes.
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx

Advertisement

Table of Contents
loading

Table of Contents