 5. When instructed, hold the ON/OFF/P Switch in P position and release within two
seconds.
 6. If the Synergy Manager is equipped with a DC Disconnect Switch, turn it to ON
position.
 7. Continue to follow the on-screen instructions to set the inverter.
 8. When instructed, disconnect the power bank and cover the power bank input port.
 9. Turn-off the DC Disconnect Switch or the ON/OFF/P Switch.
 10. Wait until the inverter shut off (all LEDs turn-off).
 11. Turn-on the DC Disconnect Switch and ON/OFF/P Switch.

Reporting and Monitoring Installation Data

Monitoring the site requires connecting the inverter to the monitoring platform, using
any of the wired or wireless options available from SolarEdge. Refer to Setting Up
Communication with the Monitoring Platform on page 60.
The Monitoring Platform
The monitoring platform provides enhanced PV performance monitoring and inverter
yield assurance through immediate fault detection and alerts at the module, string and
system level.
Using the platform, you can:
View the latest performance of specific components.
Find under-performing components, such as modules, by comparing their
performance to that of other components of the same type.
Pinpoint the location of alerted components using the physical layout.
The monitoring platform enables accessing site information, including up-to-date
information viewed in a physical or logical view:
Logical Layout: Shows a schematic tree-layout of the components in the system,
such as: inverters, Power Optimizers, strings, modules, meters and sensors, as well
as their electrical connectivity. This view enables you to see which modules are
connected in each string, which strings are connected to each inverter, and so on.
Physical Layout: Provides a bird's eye view of the actual placement of modules in
the site, and allows pinpoint issues to the exact location of each module on a
virtual site map.
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx
Chapter 5: Activating, Commissioning and Configuring the System
    57