Opening Conduit Drill Guides - SolarEdge SE11400H Installation Manual

Single phase inverter with hd-wave technology
Table of Contents

Advertisement

Opening Conduit Drill Guides

 
Communication gland: For connection of inverter communication options. Refer to Setting Up 
l
Communication     on page 52 for more information.
 
Drain valve: Drains any moisture that may be accumulated in the unit.
l
 
LCD panel: Displays inverter information and configuration parameters
l
 
LCD LEDs: Three LEDs located to the right of the LCD indicate the following inverter statuses:
l
Color
Description
Green
Power production
Communication and
Yellow
inverter shutdown
Red
All LEDs turn on while the inverter is being configured.
Opening Conduit Drill Guides
This step may be performed before or after mounting the inverter.
To open conduit drill guides:
 1.  Move the     D C Safety Unit   a nd the inverter ON/OFF switch to OFF.
NOTE
When the Safety Switch is OFF (for example during maintenance) it may be locked to prevent safety
hazard:
1. Move the safety switch to the Lock position.
2. Insert the lock through the knob opening and lock.
24
Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1
On - The inverter is producing power.
Blinking - Standby mode. The inverter is in Standby mode until its
working voltage is reached. The inverter then enters Production
mode and produces power.
Off - The inverter is not producing power. This may be during Night
mode, when the inverter ON/OFF switch is OFF or when an error
occurs.
Blinking:
Monitoring information is being received from a power
o
optimizer.
The inverter is being shut down.
o
On - There is an error. Refer to Errors and Troubleshooting on page
Fault
62 for more information.
Blinking - The inverter is being shut down.
Functionality

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents