Monitoring Platform

The monitoring platform enables monitoring the technical and financial performance of
one or more SolarEdge sites. It provides past and online information on the system
performance, both at the system and PV module levels.

Designer

Designer recommends inverter and Power Optimizer selection per site size and enables
report generation. You can create a project in Designer and export the site design with
the string layout to the monitoring platform.

Installation Tools and Material List

Standard tools can be used during the installation of the SolarEdge system.
The following recommend tools is required for installation:
Allen screwdriver for 5mm screw type for the inverter cover, Synergy Manager cover,
and inverter side screws
Standard flat-head screwdrivers set
Non-contact Voltage detector
Cordless drill (with a torque clutch) or screwdriver and bits suitable for the surface
on which the inverter and Power Optimizers are installed and for opening the
Connection Unit drill guides. Use of an impact driver is not allowed
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx
Chapter 1: Introducing the SolarEdge Power Harvesting System
Figure 2: Synergy Manager with three Synergy Units