  Inverter Interconnection Cable Interfaces
The following table describes production percentage of AC information by LED color
and ON/OFF/P switch position.
Indication
Percentage of AC
Production: 0 - 33 %
Percentage of AC
Production: 33 - 66 %
Percentage of AC
Production: 66 - 100 %

Inverter Interconnection Cable Interfaces

The cables on the right hand side of the Synergy Manager, interfaces the Synergy
Manager to the Synergy Unit of the inverter.
To connect cables, follow the writing shown next to each cable on the panel.
Figure 12 shows the interconnecting cables of the inverter.
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx
ON/ OFF/
P
switch
Red
position
OFF
ON (1)
OFF
OFF
Figure 12: Inverter - interconnection cables
LED color
Green
Blue
ON
OFF
OFF
ON
ON
ON
Comment
This indicates
power production
as percentage of
rated peak AC
output power