Front Interface Of Synergy Manager - SolarEdge SEK-I Series Installation Manual

Three phase inverter
Table of Contents

Advertisement

29
  Front Interface of Synergy Manager

Front Interface of Synergy Manager

NOTE
Some models Synergy Manager do not include DC Disconnect Switch.
DC Disconnect Switch
The DC Disconnect Switch is a manually operated safety switch for disconnecting the
DC power of the SolarEdge system.
NOTE
When the Synergy Manager is OFF (for example during maintenance) it may
be locked to prevent a safety hazard:
1. Move the switch to the Lock position.
2. Insert the lock through the knob opening
and lock.
 
ON/OFF/P Switch
Figure 10 shows the ON/OFF/P switch of the Synergy Manager.
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx
Figure 9: Synergy Manager Unit - Front interfaces
Figure 10: ON/OFF/P switch

Advertisement

Table of Contents
loading

Table of Contents