GE LPS-O Instruction Manual page 246

Line protection system
Table of Contents

Advertisement

11.6 SETTINGS
11 LPSO-LINK USER GUIDE
In both cases, a file open dialog box appears where you can select the file to load from, and the settings dialog
box with the settings will appear. Multiple files can be opened simultaneously for viewing, modifying and print-
11
ing.
Refer to Section 11.6.2: UPLOAD SETTINGS on page 11–18 for an explanation on the Settings dialog box
features.
11.6.4 GET LOGIC
This command allows you to get configurable logic from the relay. This command automatically runs the Xpres-
sion Builder program installed on your hard drive from the Xpression Builder install disk located in this instruc-
tion book. See Chapter 13: XPRESSION BUILDER.
After configurable logic is downloaded from Xpression Builder, the program returns to LPSO-Link, but does not
close Xpression Builder. Since Xpression Builder is still open, LPSO-Link will not let the user upload the config-
urable logic again. The uploaded logic window in Xpression Builder should be closed after the download by
switching to the Xpression Builder application and closing the window corresponding to the uploaded logic.
The same is true between any two consecutive logic upload operations.
11.6.5 SET DATE AND TIME
This feature helps you update the date and time in the device. Choose the Set Date/Time item from the Set-
tings menu. The Set Date/Time dialog box will appear with the date and time of the host computer.
Modify the date and time as required. Choose OK to proceed with the downloading to the device.
The Cancel button ignores the modifications done and quits the dialog box. Any modification done here is only
downloaded to the device and is not updated in the host computer.
11.6.6 CHANGE BUS/STATION ID
You can change the Bus and Station ID of a device. Choose the Change Bus/Station ID item from the Set-
tings menu. A Change Bus/Station ID dialog box will appear.
This dialog box will display the current identifiers of the device. You can modify these strings. A maximum of 32
characters are accepted for each of them.
Choose OK to proceed with the download of these strings to the device or choose Cancel to quit.
11.6.7 TOC CURVES
LPSO-Link will facilitate uploading/downloading the TOC curves to/from the device. A separate software pack-
age will be used to view and edit the TOC curves. This package will not be a part of LPSO-Link. The interface
between this package and LPSO-Link will be TOC curve files stored on the disk.
11.6.8 CALIBRATION
LPSO-Link will provide a facility to view the Calibration parameters in the device. User will also be able to mod-
ify these parameters and download them to the device. Selecting the Calibrate item from the Settings menu
will post the following dialog box.
11-
LPS-O Line Protection System
GE Power Management
20