Download Print this page

Spectra nTier Verde Array Manual page 20

Boot drive replacement

Advertisement

Replace a Boot Drive in the Verde 2U Master Node
7. To complete the replacement, you must reboot the nTier Verde 2U 
8. Wait approximately 5 minutes for the array to initialize, then continue 
October 2013
master node. Use the following instructions to reboot the array.
a. From any screen of the StrataView interface, click the Power icon in 
the lower right‐hand corner. The Power screen displays.
Figure 22 The Power icon.
b. Click Reboot. A confirmation screen appears. Click Reboot in the 
confirmation screen to reboot the array.
to Complete the Replacement on page
Boot Drive Replacement—Spectra nTier Verde Array
Replace a Boot Drive
Power icon
21.
20

Advertisement

loading
Need help?

Need help?

Do you have a question about the nTier Verde Array and is the answer not in the manual?

Questions and answers