Rear member cut-outs
4.2

Temporary connection of lift

When the lift is installed, it is sometimes necessary to operate the lift functions in order to change the posi-
tions of the cylinders and the 1st booms. Temporarily connect the lift to enable the lift functions.
1. Connect the controller to the relay card.
2. Connect earth connection (GND) and +12/24V to the quick connectors on the main power cables of the
lift.
3. When operating, connect a cable between an available power supply connection (+) and CS on the relay
card to simulate switch CS in the On position. Remove the jumper immediately after completed opera-
tion.
m
WARNING!
Take great care when running the lift functions, ensure nothing gets trapped, risk for personal injury
and material damage.
Up
Tilt
Down
Black
C1+
White
( ), if available)
Brown
Up
Yellow
Down
Blue
Tilt
Green
In
Grey
Out
4.2.1
Battery maintenance
When installing the lift, when the lift is operated repeatedly, the battery charger must be used between opera-
tions to maintain the battery charge level.
!
IMPORTANT
The battery charger must not be connected when operating the lift. Risk of material damage.
18
WL1 U7 U6 U5 U5 U4 U4 U3 U2 U1 U0
Main power switch
Slider out
Slider in
C1+
C1+
Up
Tilt
In
C2+
Up
Tilt
C3+
Up
Picture 22. Temporary connection of controller
+
+
U3
U2
U1
+
+
U0
PA+
WL2
Down
2H
Out
S5
S4
Down
S3
S2
S1
Down
Jumper
PA-
CS
CS+
S5+
S4+
S3+
Jumper (Factory installed)
S2+
S1+
www.zepro.com
ZS MK2