Temporary Connection - Zepro Z 1500-135 Installation Instructions Manual

Hide thumbs Also See for Z 1500-135:
Table of Contents

Advertisement

Safety rules
3.6

Temporary connection

When the tail lift is installed, it is sometimes necessary to operate its functions in order to change the posi-
tion of the cylinders and the lift arms. Temporarily connect the lift to enable the lift functions.
1. Connect a suitable control device to Ctrl 1/C1, see page 17/page 18.
2. Connect earth connection (GND) and +12/24V to the quick connectors on the main power cables of the lift.
3. Control card ZePRO1:
When operating, connect the cable (jumper) between the CSPWR and CS on the control card to simulate
that the CS switch is turned on. Remove the jumper immediately after completed operation.
Relay card TLC-B1:
When operating, connect a cable (jumper) between an available power supply connection (+) and CS on
the relay card to simulate switch CS being on. Remove the cable immediately after completed operation.
m
WARNING!
Take great care while running the lift functions and make sure nothing gets pinched: risk of personal
injury and material damage.
Outputs
B
Ctrl 1
E
Ctrl 1
C
2H1
B
E
Ctrl 2
C
2H2
Ctrl 6
B
E
Ctrl 3
Radio
C
Lock
Ctrl 5
B
E
Ctrl 4
Spiral
C
Lock
ZePRO1
3.6.1
Battery maintenance
When installing the lift, when the lift is operated repeatedly, the battery charger must be used between opera-
tions to maintain the battery charge level.
!
IMPORTANT
The battery charger must not be connected when operating the lift. Risk of material damage.
16
+
Sensor Power
IN OUT
PA-
PA+
Jumper
CSPWR
CS
Di 6
Di 5
Di 4
Di 3
Di 2
Di 1
Ai 2
Ai 1
Figure 23. Temporary connection
Z/ZL 1500/2000-135/155/175
U3
U0
WL1 U7 U6 U5 U5 U4 U4 U3 U2 U1 U0
C1+
C1
C1+
Down
Up
2H
Tilt
Out
In
C2+
Down
Up
Tilt
C3+
Down
Up
TLC-B1
Jumper
+
+
U2
U1
+
+
PA-
PA+
CS
WL2
CS+
S5+
S5
S4+
S4
S3+
S3
S2+
S2
S1+
S1
www.zepro.com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents