Connection Of Controller And Warning Lights; Cable Grommet - Zepro ZS MK2 Installation Instructions Manual

Tail lift
Hide thumbs Also See for ZS MK2:
Table of Contents

Advertisement

Connection of controller and warning lights
7

Connection of controller and warning lights

7.1

Cable grommet

7.1.1
Before installing cabling
To be able to install cables in the cable grommet, its protective cover must be removed and the five screws loos-
ened.
1. Disconnect the cable grommet's protective cover, which is secured with three screws, see Picture 46.
2. Loosen the five screws on the cable grommet, see Picture 48. Cables can now be installed/removed/ad-
justed in the grommet. When installing the cable, it should be done together with existing cabling using
cable ties. Ensure the length of the cable is sufficient for moving the control card. The outer sheathing on
cables that connect to the control card must be stripped 350 mm, see Picture 47.
7.1.2
After installing cabling
1. When all cables are suitably located in the cable grommet, tighten the five screws, see Picture 48.
Tightening torque: 5 Nm.
2. Install the cable grommet's protective cover with the three supplied bolts, see Picture 46.
Tightening torque: 8 Nm.
Picture 46. The cable grommet's protective
cover is fastened in place with three screws
Picture 47. The outer sheathing on cables that connect to the control card has to be stripped 350 mm.
www.zepro.com
Picture 48. Cable grommet's five screws
350 mm.
ZS MK2
35

Advertisement

Table of Contents
loading

Table of Contents