Calculating The Installation Dimensions (Slimeline) - Zepro ZS MK2 Installation Instructions Manual

Tail lift
Hide thumbs Also See for ZS MK2:
Table of Contents

Advertisement

Safety rules
3.3

Calculating the installation dimensions (Slimeline)

For easier installation it is useful to calculate and specify the necessary dimensions in advance. Efforts
should be made to install the lift as high as possible.
The platform and lift arm assembly are optimized for minimum overall length (O). Try to fit the slider profile in
such a position that when the platform is folded its rear edge aligns with the rear edge of the superstructure.
This makes sure the platform can be folded out.
46
Arm
Lifting height
135
1356
155
1542
170
1727
* Valid with 50 mm bavetta. With a 70 mm bravetta, dimension (B) is reduced by 20 mm.
www.zepro.com
Length of slide profile
157
226
Total overhang (O)
Picture 12. Installation dimensions
Slide profile
(length)
1590
1700
1850
226
157
B
B
Platform (length)
1565
1054*
1765
1965
1565
1176*
1765
1965
1565
1297*
1765
1965
ZS MK2
36
O
1734
1834
1934
1856
1956
2056
1977
2077
2177
13

Advertisement

Table of Contents
loading

Table of Contents