Installation; Support Frame - Zepro ZS MK2 Installation Instructions Manual

Tail lift
Hide thumbs Also See for ZS MK2:
Table of Contents

Advertisement

Installation

5
Installation
5.1

Support frame

1. Carefully drive the slide function so the support frame is positioned as far back as possible.
2. Carefully raise the 1st booms to their highest position.
3. Raise the support frame to the trailer frame. A workshop jack is helpful. Measure the distance between
the 1st boom and the platform, see Picture 24.
Position in Y-axis: Adjust the angle of the arms by carefully running the lift up/down to attain the correct
dimensions in the Y-axis when all the attachment points of the tail lift bear on the trailer frame.
Position in X-axis: Install the slide profiles against the frame in position to attain the correct dimensions
in the X-axis. If necessary, the rearmost position of the frame can be adjusted forwards in the slide profile
with the help of the integrated adjustment for working position, see section 5.2.
Picture 24. Installation of support frame in the working position
20
X= 94 mm (with 50 mm bavetta)
114 mm (with 70 mm bavetta)
ZS MK2
www.zepro.com

Advertisement

Table of Contents
loading

Table of Contents