Optional) Power-Off - Huawei NetCol5000-C030 User Manual

In-row chilled water smart cooling product
Hide thumbs Also See for NetCol5000-C030:
Table of Contents

Advertisement

NetCol5000-C(030, 032, 065) In-row Chilled Water
Smart Cooling Product
User Manual
----End

4.7 (Optional) Power-Off

Context
In shutdown mode, the Shutdown button is green (unavailable) and the Start
button is gray (available).
Procedure
Step 1 Tap Shutdown on the home screen. A warning is displayed, indicating whether to
shut down the smart cooling product, as shown in
Issue 04 (2021-03-15)
Figure 4-31 Commissioning succeeded
Figure 4-32
is displayed if component commissioning fails, which ends
startup wizard commissioning.
Figure 4-32 Commissioning failed
NO TE
If commissioning fails, tap Commissioning failed. in
Copyright © Huawei Technologies Co., Ltd.
4 Power-On Commissioning
Figure 4-32
to view the details.
Figure
4-33.
120

Advertisement

Table of Contents
loading

This manual is also suitable for:

Netcol5000-c032Netcol5000-c065

Table of Contents