product or not. If you select to commission it at other times, choose Maint >
Wizard Startup to start commissioning.
Tapping No or Exit, submission timeout, and system exception all result in
commissioning failures. Choose Maint > Wizard Startup to enter the Wizard
Startup screen for new commissioning.
Procedure
Step 1 On the home screen, choose Maint > Wizard Startup, as shown in
Figure 4-27 Startup wizard
Step 2 Tap Yes. The checking before startup screen is displayed, as shown in
Figure 4-28 Checking before startup
Step 3 Tap Yes for check items one by one according to the prompt messages on the
screen.
Step 4 Tap Yes and enter the screen where you select commissioning items, as shown in
Figure
Issue 04 (2021-03-15)
NO TICE
NO TE
● For the initial startup wizard, Last record is in grey, indicating that the operation is not
allowed.
● For the non-initial startup wizard, choose Last record and you can view the last startup
wizard report.
4-29.
Copyright © Huawei Technologies Co., Ltd.
4 Power-On Commissioning
Figure
4-27.
Figure
4-28.
118

Advertisement

Table of Contents
loading

This manual is also suitable for:

Netcol5000-c032Netcol5000-c065

Table of Contents