Power Up The Node; Verify The Operation Of A New 4-Port Card; Return A Faulted Part - Dell EMC PowerStore 1000 Installation And Service Manual

Hide thumbs Also See for EMC PowerStore 1000:
Table of Contents

Advertisement

Figure 47. Locking the release lever
3. Connect each cable into the same port from which it was removed.

Power up the node

Power up the node as described in

Verify the operation of a new 4-port card

Steps
1. From PowerStore Manager, select Hardware.
2. Select the appliance where you replaced the 4-port card.
3. On the Components card, under Rear View, expand BaseEnclosure.
4. Expand the node that includes the 4-port card, expand EmbeddedModule, and then select 4PortCard.
The status of the replacement 4-port card should read Healthy. If the status is still Faulted, wait a few minutes and
refresh PowerStore Manager. If the status does not change, ensure that the embedded module and 4-port card are correctly
seated, or contact your service provider.

Return a faulted part

About this task
For US customers, return defective material within five business days. For International customers, return defective material
within 10 business days. The materials required to return your defective part are supplied with the good part shipment.
Steps
1. Package the faulted part in the shipping box that contained the replacement part.
2. Ship the failed part to your service provider as described in the instructions that were included with the replacement part.
3. For more information about returning customer-replaceable parts:
a. Open PowerStore Manager.
b. Click Settings on the upper right of the screen.
c. Click General Support.
d. Under Drives, Power Supplies, and Other Parts, click Return Part.
e. If your screen does not show the Return Part link, contact your service provider for instructions.
48
Base enclosure service procedures
Power control
procedures.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents