Power Control Procedures Preview; Powering Off Procedures For Powerstore Node - Dell EMC PowerStore 1000 Installation And Service Manual

Hide thumbs Also See for EMC PowerStore 1000:
Table of Contents

Advertisement

○ Power on the node (power_on argument).
For more information about the service scripts, see the PowerStore Service Scripts Guide.
● If both nodes in an appliance reboot in service mode, always return Node A to normal mode first to avoid management
software conflicts. After Node A is operating normally, you can return Node B to normal mode.

Power control procedures preview

The following table provides a preview of the steps that are required to power off or up the relevant component in your cluster:
Table 5. Power control procedures preview
Component
Node
Appliance
Cluster

Powering off procedures for PowerStore node

This section includes the following procedures:
Action
Power off
Power on
Reboot
Power off
Power on
Power off
Power on
PowerStore T model
Use PowerStore Manager.
Or
Run a service script.
● If the node was removed
from the chassis, reseat
the node into the chassis,
and reconnect its power
cable.
● If the node was not
removed from the chassis,
run a service script.
Use PowerStore Manager.
Or
Run a service script.
Use PowerStore Manager.
If the nodes or expansion
enclosures were removed
from the chassis, reseat
the expansion enclosures
and nodes. Reconnect power
cables in the right order.
Use PowerStore Manager.
Or
Run a service script.
If the nodes or expansion
enclosures were removed
from the chassis, reseat
the expansion enclosures
and nodes. Reconnect power
cables in the right order.
PowerStore X model
Use VMware vCenter server.
● If the node was removed
from the chassis, reseat
the node into the chassis,
reconnect its power cable,
and use VMware vCenter
server.
● If the node was not
removed from the chassis,
run a service script and
use VMware vCenter
server.
Use VMware vCenter server.
Use PowerStore Manager.
If the nodes or expansion
enclosures were removed
from the chassis, reseat
the expansion enclosures
and nodes. Reconnect power
cables in the right order, and
use VMware vCenter server.
Use VMware vCenter server.
If the nodes or expansion
enclosures were removed
from the chassis, reseat
the expansion enclosures
and nodes. Reconnect power
cables in the right order, and
use VMware vCenter server.
Power control procedures
111

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents