INSTALLATION INSTRUCTIONS
Important
Set the PROCESSOR for the same voltage as the power at the site.
[7] Move WIRE 8A to the correct location on TB5:
[8] Apply the correct DATA STRIP inside the DOOR for the ELECTRICAL BOX to indicate the frequency and
voltage.
Connecting the POWER CABLE to the 2000 PROCESSOR
2 WIRE TIES
[1] Install the STRAIN RELIEF BRACKET.
[2] Insert the POWER CABLE through the FRONT PANEL.
[3] Install the CABLE in the STRAIN RELIEF.
[4] Assemble the STRAIN RELIEF to the BRACKET with the NUT.
[5] Extend the CABLE to the ELECTRICAL BOX.
[6] Connect the POWER CABLE to the PROCESSOR:
Voltage at the Site:
100/200 VAC, 120/208 VAC, 127/200 V or 120/240 VAC
220/380 VAC, 230/400 VAC, or 240/415 VAC
24
Frequency
JUMPER Location
50 Hz
60 Hz
Site Voltage
Location of WIRE 8A
200 or 208 V AC
220 or 230 V AC
240 V AC
CABLE
TB3-7 to TB3-8
TB3-7 to TB3-9
TB5-2
TB5-3
TB5-4
NUT
Advance to:
Step
7
Step
9
STRAIN RELIEF
STRAIN RELIEF
BRACKET
H172_1025BCA
H172_1025BC
04DEC98 – 7C8771