Vesa Mount Installation - GRASS VALLEY ATP-2000 User Manual

Advanced touch panel
Table of Contents

Advertisement

Panel Installation

Vesa Mount Installation

Vesa Mount Installation

Alternatively, the ATP-2000 can be mounted on a suitable Vesa bracket via its Vesa 75x75
mount:
1 Select a location with a nearby AC power socket.
2 Install the DC Power Supply Module nearby.
3 Locate the ATP-2000 unit in position.
Fig. 2-3: ATP-2000 Unit Rear View
4 Secure the ATP-2000 unit to the Vesa mounting bracket with four M4 x 10 mm screws
and washers. Fasten it to captive nuts of the rack frame mounting strip.
8
CAUTION
Support the body of the DC Power Supply Module.
Do not let it hang by any electrical cords.
CAUTION
Allow 50 mm (approximately 2 inches) clearance at the rear of the ATP-
2000 for unit cooling airflow, mating connectors and cables.
Note: See Environmental, on page 49 in Appendix A, for information about
the ATP-2000 unit's operating temperature range.
Vesa mounting holes, 
75 mm x 75mm square pattern
Air Venting Grilles
GV label

Advertisement

Table of Contents
loading

Table of Contents