Installing The Zone Ctrl Ii; To Mount The Zone Ctrl Ii - Carrier Zone Ctrl II Installation And Startup Manual

Table of Contents

Advertisement

Installing the Zone Ctrl II

Installing the Zone Ctrl II
1
Mount the controller (page 6).
2
Wire the controller for power (page 10).
3
Set the controller's address (page 12).
4
Wire the controller to the BACnet MS/TP or BACnet ARC156 network (page 15).
5
Wire inputs and outputs. (page 16)
6
Wire devices to the controller's Rnet port (page 19).
For details on installing a secondary terminal, see Using a VAV Zone II Secondary Duct for a dual duct system
(page 25).

To mount the Zone Ctrl II

To disconnect and mount the controller and actuator separately
Zone Ctrl II and
VAV Zone II Secondary Duct Installation and Start-up Guide
Error! No text of specified style in document.
6
CARRIER CORPORATION ©2019
All rights reserved

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vav zone ii secondary ductOpn-b3-p-02Opn-sectrm-02

Table of Contents