Installing the VVT Zone II

Installing the VVT Zone II
To install the VVT Zone II:
1
Mount the controller to the VVT box. (page 6)
2
Wire the controller for power. (page 10)
3
Set the controller's address. (page 12)
4
Wire the controller to the BACnet MS/TP or BACnet ARC156 network. (page 12)
5
Wire devices to the Rnet port. (page 13)
6
Wire sensor(s) to the controller. (page 19)
7
Wire equipment to the controller's outputs. (page 25)

Mounting the VVT Zone II

To mount the controller and actuator

To disconnect and mount the controller and actuator separately
VVT Zone II Controller
Installation and Start-up Guide