System Maintenance; Preliminary Checks - GE LOGIC C2 Series Technical Publication

Ultrasound system
Table of Contents

Advertisement

Care and Maintenance

Preliminary checks

Table 4-1:
Step
Item
1.
Ask and Listen
2.
Paperwork
3.
Power up
4.
Probes
5.
Displays
6.
InSite
7.
Review Error Logs
8.
Diagnostics
9.
Presets
10.
Image Archive
4-6

System maintenance

The preliminary checks take about 15 minutes to perform. Refer
to the Ultrasound system user documentation whenever
necessary.
Ultrasound system preliminary checks
Ask the customer if they have any problems or questions about the
equipment.
Fill in the top of the EQC inspection form. Record all probes and
Ultrasound system options.
• Turn the Ultrasound system power on and verify that all fans and
peripherals turn on.
• Watch the displays during power up to verify that no warning or error
messages are displayed.
• Where applicable, confirm that the battery is charged. If no AC Input
present, use the internal battery.
Verify that the Ultrasound system properly recognizes all probes.
Verify proper display on the monitor and touch panel (where present).
Where applicable, for Warranty and Contract Customers only:
• Verify that InSite is functioning properly.
• Ensure two-way remote communications.
Where applicable, Error Logs can be reviewed via system diagnostics.
Optional.
Backup all Customer Presets to an appropriate media.
Back up the Image Archive onto appropriate media.
Ultrasound System
Description
Common Service Information
Direction 5444964-100 English Rev. 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents