Probes Environmental Requirements; Time And Manpower Requirements - GE LOGIC C2 Series Technical Publication

Ultrasound system
Table of Contents

Advertisement

Site Preparations

Probes environmental requirements

Operation and storage temperatures for probes

Time and manpower requirements

WARNING
3-20
For probe operation and storage temperature information, refer
the the Ultrasound System or Probe User Manual.
Site preparation takes time. Begin site preparation checks as
soon as possible, if possible, six weeks before delivery, to allow
enough time to make any changes.
For Console Ultrasound systems and for Ultrasound systems
mounted on a Docking/Isolation Cart, have two people
available to deliver and unpack the Ultrasound System.
Attempts to move the Ultrasound system considerable
distances or on an incline by one person could result in injury
or damage or both.
Ultrasound System
Common Service Information
Direction 5444964-100 English Rev. 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents