Facility Needs; Contents In This Section; Purchaser Responsibilities - GE LOGIC C2 Series Technical Publication

Ultrasound system
Table of Contents

Advertisement

Contents in this section

Purchaser responsibilities

Ultrasound System
Direction 5444964-100 English Rev. 5
'Purchaser responsibilities' on page 3-21
'Required facility needs' on page 3-23
'Desirable features' on page 3-25
The work and materials needed to prepare the site is the
responsibility of the purchaser. Delay, confusion, and waste of
manpower can be avoided by completing pre-installation work
before delivery. Purchaser responsibility includes:
Procuring the materials required
Completing the preparations before delivery of the
Ultrasound system
Paying the costs for any alterations and modifications not
specifically provided in the sales contract
Common Service Information

Facility needs

Facility needs
3-21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents