GE LOGIC C2 Series Technical Publication page 108

Ultrasound system
Table of Contents

Advertisement

Care and Maintenance
Generic procedure
NOTE:
1. Ultrasound system
2. Mains power cable
3. Accessible Metal Parts (chassis - non-earth
ground, unprotected surface)
Figure 4-3. Set Up for test of Earth Leakage Current, UL60601-1/IEC60601-1
4-30
1. Connect the Safety analyzer to wall AC power outlet.
2. Plug the equipment under test power cable into the
receptacle on the panel of the Electrical Safety Analyzer.
3. Connect the ECG cable to the Ultrasound system and the
patient leads to the analyzer.
4. Select the "Patient Lead Leakage" function on the Electrical
Safety Analyzer.
5. Test opening and closing the ground with the Ultrasound
system on and off.
For more information, refer to the safety analyzer's user manual.
Measurements should be made under the test conditions
specified in:
Table 4-6 on page 4-20, or
Table 4-7 on page 4-21, as applicable.
For each combination, the operating controls, such as the lead
switch, should be operated to find the worst case condition.
Record all data and keep the record of the results with other
hard copies of maintenance data.
Ultrasound System
4. ECG patient cable
5. Electrical safety analyzer
6. AC wall outlet
Common Service Information
Direction 5444964-100 English Rev. 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents