Mounting Triango 100 C - Derungs Dmed Triango 100 Installation And Operating Instructions Manual

Treatment lights
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 23
ENG
3.3
Triango 100 F
Included with delivery:
1 luminaire head with sterilizable handgrip
1 roller frame
1x power cable
1x lower support tube
1x upper support tube with spring balanced arm
1x set for assembly of triango F
26
4

MOUNTING Triango 100 C

4.1
Workload data
Bending moment M
B
Vertical weight F
G
4.2
Attach ceiling bracket
DANGER
Assembly by qualified personnel
Mounting must be done by qualified per-
sonnel only. Lack of appropriate knowledge
could be life-threatening.
DANGER
Life-threatening danger from a falling lumi-
naire.
The ceiling must be made of solid concrete
to guarantee a secure hold.
Use a suitable fastening.
DANGER
Electric shocks are life-threatening.
All poles of the luminaire must be separat-
ed by an external lockable switch from the
power supply network.
Saw the ceiling conduit to the desired length at
the top end using a metal saw and deburr.
6
1
metric
2
Remove fastening screw 3 .
Insert ceiling tube 1 into the ceiling bracket 2
and drill with d= 9mm. Use the existing hole in
the ceiling bracket. Bore the opposite hole
separately.
Note: pull through the cable after sawing and
drilling from the lower side to the upper pipe
side (the 3-pin plug first)
245 Nm
160 N
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents