32
T10FM
SUNSTAR传感与控制 http://www.sensor-ic.com/ TEL:0755-83376549 FAX:0755-83376182 E-MAIL:szss20@163.com
Test LED
Fig. 7.4: Functional test for power transmission
7.3.2 Alignment of the speed module
When required, you can test the correct functioning of the speed measuring
system.
1. Remove the cover of the stator housing.
–1
2. Turn the rotor by at least 2 min
(=rpm (revs per minute)).
If both the control LEDs come on while you are turning the rotor, the speed
measuring system is properly aligned and fully operational.
Green control LEDs
Fig. 7.5: Control LEDs of the speed measuring system
CAUTION
When closing the cover of the stator housing, make sure that the inter-
nal connector cables are positioned in the grooves provided and are not
caught up.
HBM
B 23.T10FM.10 en
SUNSTAR自动化 http://www.sensor-ic.com/ TEL: 0755-83376489 FAX:0755-83376182 E-MAIL:szss20@163.com