Magnet Cover Installation; Complete Installation; Maintenance - Bosch RADION B810 Installation Manual

Hide thumbs Also See for RADION B810:
Table of Contents

Advertisement

RADION receiver SD
2.4

Magnet cover installation

During the installation of the plastic magnet cover, the cover is
not designed to be separated from the base after the base and
cover are snapped together. Damage to the plastics may occur if
separated.
2.5

Complete installation

Testing the entire RADION system can only be achieved by
performing an area wide test through the control panel and
corresponding keypad(s). This is achieved by performing an
overall service walk test. Refer to your control panel
documentation for system-walk, or other system-wide testing
procedures.
To ensure proper operation of the RADION devices, test the
basic functionality of the device locally. Depending on the
RADION device to be tested, perform the following procedures
for functionality:
2.6

Maintenance

Bosch Security Systems B.V.
When testing the receiver, power up the compatible control
panel in which the receiver is connected to and observe the
LED behavior on the receiver.
Local walk testing can be performed on the motion
detectors as defined in the tritech and PIR chapters of this
guide.
Magnet testing can be performed by opening or closing the
door/window in which the magnet is installed on.
General installation | en
2020.05 | 13 | F.01U.261.834
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B810-chi

Table of Contents