General Installation - Bosch RADION B810 Installation Manual

Hide thumbs Also See for RADION B810:
Table of Contents

Advertisement

8
en | General installation
2

General installation

Phases of installation
The installation of the RADION system is achieved by following
the sequential process as defined in this chapter. Overall, there
are four main phases;
It is essential that these steps or phases are adhered to in the
order mentioned above for proper functionality and operation.
When installing a RADION system, you must plan your
installation based on the control panel and RADION device
specifications, and the radio-frequency signal strength (RFSS)
between devices, receivers, and control panels.
Installation considerations
2020.05 | 13 | F.01U.261.834
Planning
Physical installation of the devices
System enrollment/configuration
System testing (walk test, pattern test)
RADION devices are intended only for indoor, dry
applications.
Mount RADION devices on flat, rigid surfaces. Some devices
can be optionally corner mounted as indicated in the
installation instructions.
Avoid mounting RADION devices in areas with large,
metallic objects, electrical panels, or electric motors. They
might reduce the radio-frequency (RF) range of a RADION
device.
Avoid installing the devices where excessive humidity,
moisture, or temperatures outside of the acceptable
operating range exist.
Wire all objects according to their specifications.
RADION devices use batteries of varying types. When
installing batteries, observe safety and polarity
recommendations as indicated in the documentation for
those products.
RADION receiver SD
Bosch Security Systems B.V.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B810-chi

Table of Contents