Chapter 3 Procedures Before Operation - Mitsubishi Electric ER-1V680D1 User Manual

Rfid interface module, melsec iq-r series recognized
Table of Contents

Advertisement

3
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation of the RFID interface module.
1.
System design
Verify the specifications of RFID interface module and design the system. ( Page 21 Functional Specifications)
2.
Installation
Install the RFID interface module to the base unit. ( MELSEC iQ-R Module Configuration Manual)
3.
Wiring
Wire the power supply, and connect and install the amplifiers and antennas. ( Page 24 INSTALLATION AND WIRING,
 User's manual for Omron RFID system V680 series products)
4.
RF tag installation
Install the RF tags. ( User's manual for Omron RFID system V680 series products)
5.
Profile installation
Install the profile, module label, and module FB to the engineering tool. ( Page 32 Profile installation)
6.
Powering on the systems
After checking that the CPU module is in STOP state, power-on the RFID interface module.
7.
Addition of modules and parameter setting
Add the RFID interface module to the module structure and set the parameters using the engineering tool. ( Page 31
Setting Procedure)
8.
Test communication
Implement test communication and installation environment measurements in TEST mode. ( Page 78 Test Function)
9.
Programming
Create a communication program with RF tags. ( Page 93 Sample Program, Page 101 Sample Program (with Remote
Head Module))
Create the programs to execute the following functions as required.
• RF Tag Write Protect Function ( Page 87 Write protect function)
• RF Tag Number of Writes Management Function ( Page 62 Manage number of writes)
• RF Tag Data Check Function ( Page 59 Check data)
• RF Tag Memory Error Correction Function ( Page 42 Read with error correction, Page 54 Write with error correction)
10.
Writing data to the programmable controller
Write the set parameters and created programs to the CPU module with the engineering tool. After writing, power off and on,
or reset the CPU module. ( MELSEC iQ-R CPU Module User's Manual (Startup))
11.
Program execution
Set the CPU module to RUN state, check that the program is normally running.
3 PROCEDURES BEFORE OPERATION
22

Advertisement

Table of Contents
loading

This manual is also suitable for:

Er-1v680d2

Table of Contents