UPS5000-S-(50 kVA-300 kVA)
User Manual
Step 2 Connect signal cables for each UPS.
----End
3.4 Installation Verification
Table 3-7
If the check results of listed items 8 and 9 in
acceptance criteria, the UPS may be damaged.
Table 3-7 Installation checklist
No.
01
Issue 11 (2020-12-07)
Figure 3-98 Connecting signal cables in a dual-bus system
lists check items.
NO TICE
Item
UPS installation
Copyright © Huawei Technologies Co., Ltd.
Table 3-7
do not meet the
Acceptance Criteria
The UPS is securely installed and does
not tilt due to vibration.
3 Installation
129