Installation - electric, steam and gas heating
Electric installation
Function check
Check that the drum is empty and the door has
been closed.
Start the machine.
Check that the safety lock is working: The
drum, ventilator and heat must stop if the
front door is opened as much as 50 mm.
The direction of rotation should be clockwise (see
illustration). If the direction is reversed, shift two
phases.
Let the machine work for 5 minutes on a program
that requires heat. Then check whether the heat-
ing is working by opening the front door to check
if heat can be felt.
If the above test-points are found to be in order,
the tumbler is ready for use.
If deficiencies or faults are detected, please con-
tact your local service organisation/dealer.
487 18 39 01 - 300/500/750 - GB
33