Drilling; Digging With Backhoe; Sawing; Leaving Jobsite - Kubota RT120Q Operator's Manual

Table of Contents

Advertisement

RT120Q Operator's Manual
Operation Overview - 73

Drilling

Drilling
1. Start unit. See page 84.
2. Dig approach trench and target trench. See page 128.
3. Assemble drill string and position tractor. See page 130.
4. Begin drilling. See page 131.
5. Use drill string guide as needed. See page 132.
6. Add rod. See page 133.
7. Backream. See page 134.
8. Shut down tractor. See page 87.
9. Disassemble joints. See page 138.

Digging with Backhoe

1. Start unit. See page 84.
2. Set stabilizers and unstow backhoe. See page 120.
3. Excavate. See page 122.
4. Stow backhoe properly. See page 124.
5. Shut down tractor. See page 87.

Sawing

1. Start unit. See page 84.
2. Position tractor and controls. See page 140.
3. Begin sawing. See page 141.
4. Complete the installation. See page 143.
5. Backfill the trench. See page 152.
6. Shut down tractor. See page 87.

Leaving Jobsite

1. Backfill if necessary. See page 152.
2. Rinse equipment. See page 152.
3. Stow tools. See page 152.
4. Haul equipment from jobsite. See page 96.

Advertisement

Table of Contents
loading

Table of Contents