Kubota RT120Q Operator's Manual page 153

Table of Contents

Advertisement

Complete the Job - 152
Restore Jobsite
After product is installed, return spoils to the
trench with optional backfill blade.
Backfilling
1. Position unit at end of trench, several feet
from spoils. Aim tractor at outer edge of
spoils.
2. Adjust backfill blade to fit land contour.
3. Move outer edge of spoils toward trench. Take
two or more passes at spoils rather than
moving all spoils at once.
4. Repeat on other side of trench, if necessary.
5. Engage float and make final pass over trench.
Rinse Equipment
Spray water onto equipment to remove dirt and mud.
NOTICE:
Do not spray water onto operator's console. Electrical components could be damaged. Wipe down
instead.
Ensure all mud and debris is rinsed from operator's station floor.
Ensure all mud and debris is rinsed from tracks before parking unit overnight.
Stow Tools
Make sure all tools and accessories are loaded and properly secured on trailer.
RT120Q Operator's Manual
Restore Jobsite

Advertisement

Table of Contents
loading

Table of Contents