Operate - Kubota RT120Q Operator's Manual

Table of Contents

Advertisement

RT120Q Operator's Manual

Operate

Operate
To help avoid injury: Expose lines by hand before digging. Cutting high voltage cable can cause
electrocution
1. If equipped with combo, ensure that the trench/plow switch is in the plow position.
2. Move ground drive hand control forward to plowing speed and lower plow blade into ground.
NOTICE:
Lower plow into ground before moving plow lift control or plow swing control to float.
Do NOT move ground drive to reverse with plow blade in the ground.
3. Move plow lift control to float.
4. Move plow swing control to float.
5. Increase engine speed to full throttle.
6. Move attachment speed/direction control forward to start plow vibration. PLOW WILL VIBRATE.
NOTICE: Do not operate vibrator unless plow is in the ground.
7. Reduce attachment speed to a point with the least tractor vibration and the highest ground drive speed
possible without track slippage. Adjust vibrator speed if ROPS vibrates excessively.
8. Check cable for damage during plowing.
Crushing weight could cause death or serious injury. Stay
away.
Electric shock will cause death or serious injury. Stay
away.
274-049
Read operator's manual. Follow safety rules and know
how to use all controls. Your safety is at stake.
Plow - 111
273-475

Advertisement

Table of Contents
loading

Table of Contents