Planning

1. Gather information about jobsite. See page 76.
2. Inspect jobsite. See page 77.
3. Classify jobsite. See page 78.
4. Select chain and teeth to match your soil type, if necessary. See page 148
5. Check supplies and prepare equipment. See page 80.
6. Haul equipment to jobsite. See page 96.

Trenching

1. Start unit. See page 84.
2. Position tractor and controls. See page 102.
3. Begin trenching. See page 104.
4. Engage cruise control if desired. See page 146.
5. Complete the installation. See page 106.
6. Shut down tractor. See page 87.

Plowing

1. Start unit. See page 84.
2. Position tractor and controls. See page 108.
offset plowing - page 112
coordinated plowing - page 112
crabbing - page 112
3. Attach product. See page 109.
4. Begin plowing. See page 111.
5. Engage cruise control if desired. See page 146.
6. Complete the installation. See page 113.
7. Shut down tractor. See page 87.