SmartNode 4740 Series (48–128 Ports) User Manual
4. Tighten the screws on the block to secure the wires.
5. Repeat steps 2 through 4 to install a power cable to the second terminal block.
6. Apply power to the DC power source.
The SmartNode device does not have a power switch; it powers on when the
Note
power source is activated.
7. Verify that the green POWER LEDs on the rear panel are lit. Each LED blinks quickly during bootloader
phase and blinks slowly during the boot process. It stays lit constantly when the system is up and running.
Congratulations, you have finished installing the SmartNode device! Now go to Chapter 4,
tion"
on page 46.
Installing the SmartNode 4740
Figure 23. Power source leads installation
3 • SmartNode Installation
"Initial Configura-
45
Need help?
Do you have a question about the SmartNode 4740 Series and is the answer not in the manual?