SmartNode 4740 Series (16–32 Ports) User Manual
Planning the Installation
Before installing the SmartNode device, the following tasks should be completed:
•
Create a network diagram (see section
•
Gather IP related information (see section
•
Install the hardware and software needed to configure the SmartNode. (See section
page 29)
•
Verify power source reliability (see section
When you finish preparing for SmartNode installation, go to section
page 29 to install the device.
Site log
Patton recommends that you maintain a site log to record all actions relevant to the system, if you do not
already keep such a log. Site log entries should include information such as listed in
Entry
Installation
Upgrades and maintenance
Configuration changes
Maintenance
Comments
Software
Network information
Network connection considerations that you should take into account for planning are described for several
types of network interfaces in the following sections.
Network Diagram
Draw a network overview diagram that displays all neighboring IP nodes, connected elements and telephony
components.
IP related information
Before you can set up the basic IP connectivity for your SmartNode 4740 Series you should have the following
information:
•
IP addresses used for Ethernet LAN and WAN ports
•
Subnet mask used for Ethernet LAN and WAN ports
Planning the Installation
"Network information"
"IP related information"
"Power source"
Table 4. Sample site log entries
Make a copy of the installation checklist and insert it into the site log
Use the site log to record ongoing maintenance and expansion history
Record all changes and the reasons for them
Schedules, requirements, and procedures performed
Changes and updates to SmartWare software
3 • SmartNode Installation
on page 28)
on page 28 for more information)
on page 29).
"Installing the SmartNode 4740"
table
Description
Notes, and problems
"Software tools"
on
on
4.
28
Need help?
Do you have a question about the SmartNode 4740 Series and is the answer not in the manual?
Questions and answers