Mounting the Switch on Desk or Shelf

Step 1:
Verify that the workbench is sturdy and reliably grounded.
Step 2:
Attach the four adhesive rubber feet to the bottom of the switch.

Grounding

The back panel provides a ground screw. After the Switch is mounted and connected, the grounding screw can
be used for grounding. Grounding and wire routing help limit the effects of noise due to EMI (electromagnetic
interference).
Note:
Run the ground connection from the ground screw to the grounding surface before
connecting devices.
Refer to
IEC 60417
for Graphical Symbols definitions. Refer to
See
ITU-T K.27
for Bonding configurations and earthing inside a telecommunications building.
See
GR-1089-CORE
for Electromagnetic compatibility and electrical safety—generic criteria for network
telecommunications equipment.
33814 Rev. A
Attaching the Rubber Feet
https://www.transition.com
SM8TAT2SA-DC Install Guide
IEC 50
[3] for terminology definitions.
Page 20 of 43

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SM8TAT2SA-DC and is the answer not in the manual?

Table of Contents