5.10.3. Installing IP54 roof-mounted cooling units
One by one, install the IP54 roof-mounted cooling units on top of the PCU
compartments that have the designated openings.
Table 5-3 Installation material per IP54 unit
Item
Self-tapping Torx screws
Washers with sealing
Tube spacers
1. Align the water inlet / outlet (1), drain outlet (2), and cables (3) of the unit
with the designated openings in the cabinet roof.
2. Slowly lower the cooling unit onto the cabinet.
Make sure that the water inlet / outlet, the drain outlet, the cables and the
screw holes fit.
3. Screw the cooling unit to the cabinet roof.
4. To get to the water inlet / outlet and the drain outlet from inside the cabinet.
•
Try to reach them from underneath the cable duct at the front
•
Remove the back wall if necessary to reach them from the back.
PRODUCT
ACS5000W
Quantity
22
22
2
DOCUMENT KIND
User manual
Details
M6x16
6.8x1 (4.8x2.8)
2
1
DOCUMENT ID.
3BHS799208 E01
MECHANICAL INSTALLATION
3
REV.
LANG.
PAGE
F
en
76/178