7.6. Commissioning checklists

This checklist is designed to help you prepare the drive and associated equipment
for commissioning.

7.6.1. Mechanical installation checklist

1)
Drive is aligned according to drive layout drawing (if delivered in several
transport units) and installed according to the instructions in this user
manual (3BHS799208 E01 F).
2)
Silicon sealant is applied across roof plate gaps.
3)
Roof joints are installed.
4) Pipe joints are orientated and torqued correctly.
5)
Roof attachments are installed (if applicable).
6)
Busbars are installed and torqued correctly.
7)
Raw water piping is completed and pipes are flanged to the drive (if
applicable).
8) Raw water supply is ready.
9)
Visual inspection:
No badly affixed or damaged components
No foreign objects left in the cabinet
No dirt, dust or moisture in the cabinet

7.6.2. Electrical installation checklist

1)
Types and cross sections of control cables suitable for the signal type
and signal level.
2)
Types and cross sections of power cables selected according to the ABB
power cable specification.
3)
Pulse encoder cable shields are connected to the shield earthing point
and not connected directly to the pulse encoder interface (applies only to
drives with pulse encoder interface).
4) Cable entries prepared according to the instructions in the user manual
(3BHS799208 E01 F).
5)
Control cable screens and conductors are connected as instructed in the
user manual, labeled appropriately, and the customer side connections
are completed.
6)
Heating cables (if supplied) connected
PRODUCT
ACS5000W
DOCUMENT KIND
User manual
DOCUMENT ID.
3BHS799208 E01
COMMISSIONING
REV.
LANG.
PAGE
F
en
114/178