See-Through Lid; Operational Check; Figure 3-23. The Head For The 24 Deep Well Plate Fitted; Figure 3-24. See-Through Lid Fitted - Abbott PLEX-ID SP User Manual

Table of Contents

Advertisement

Installation

Operational check

Figure 3–23. The head for the 24 Deep Well Plate fitted
During operation, the sliding door can be open or closed or the whole

See-through lid

see-through lid can be absent (Figure 3–24). The closed door protects
the processing against environmental contamination.
See-through lid
Sliding door (open)
Figure 3–24. See-through lid fitted
Operational
First switch the instrument ON. The instrument performs initialization
tests and adjustments.
check
The display quickly shows the internal software version. This happens
when the initialization tests and adjustments have been completed.
It is recommended that you carry out a check run using a demo
protocol to verify proper instrument operation. Run the check protocol
(Check_96dw_tip or Check_24dw_tip) under the Maintenance menu
according to the magnet head and plastics you are using. If the check is
all right, proceed with your own runs.
Abbott Laboratories
PLEX-ID SP User Manual 10/2009 N09455
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents