11. Install the primary riser cage.
12. Connect the mini-SAS cables from the expander to SFF drive backplanes/Smart Array controller.
13. Install the access panel.
14. Install the server into the rack.
15. Connect all peripheral cables to the server.
16. Connect each power cord to the server.
17. Connect each power cord to the power source.
18. Power up the server.
19. If removed, install the bezel.
The installation is complete.
Installing the M.2 SSD enablement option
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
•
T-15 Torx screwdriver
•
Phillips No. 1 screwdriver
Procedure
1.
If installed, remove the bezel.
2.
Power down the server.
3.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Disconnect all peripheral cables from the server.
5.
Remove the server from the rack.
6.
Remove the access panel.
7.
Remove the riser cage.
Hardware options installation
91