Installing the serial port cable
Prerequisites
Before you perform this procedure, make sure that hex nut screwdriver is available.
Procedure
1.
If installed, remove the bezel.
2.
Power down the server.
3.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Disconnect all peripheral cables from the server.
5.
Remove the server from the rack.
6.
Remove the access panel.
7.
If expansion board is installed in the secondary riser, remove the riser.
8.
Remove the serial port blank.
9.
Install the serial port cable.
Hardware options installation
103